Shortcuts, units and limits

Everything you may need to look up while working, on one page.

Keyboard shortcuts

On macOS use ⌘ where Ctrl is shown. Shortcuts are ignored while you type in a text field.

Everywhere

KeysAction
Ctrl+SSave the project
Ctrl+ZUndo
Ctrl+Y · Ctrl+Shift+ZRedo
EscCancel the gesture in progress; close menus; leave the expanded simulation view

Draw

KeysAction
1Select
2Edit (reshape paths)
3Pan
4Path
5Curve
6S-curve
7Station
8Link
9Traffic zone
F8Toggle Ortho
Ctrl (held)Temporary Ortho; constrains moves and control points to an axis
Alt+clickSelect the path under a station or link
Shift+click / Shift+dragAdd to or remove from the selection
Delete · BackspaceDelete the selection
Ctrl+C / Ctrl+VCopy the selection / paste it by choosing base point and insertion point (Enter: lower-left corner, Esc cancels)

Plant logic

KeysAction
Ctrl+C / Ctrl+VCopy / paste selected blocks with their internal connections
Shift/Ctrl+clickAdd or remove a block from the selection
DeleteDelete selected blocks or connection
EscCancel a connection in progress

Mouse, trackpad and touch

GestureAction
Wheel · two-finger scrollPan (Shift + wheel: horizontal)
Ctrl + wheel · pinchZoom around the pointer
Middle-button dragPan
Two fingers on a touchscreenPan and zoom together
One finger in SimulatePan

In the Plant logic editor the wheel zooms and the middle button pans. Adding a second finger cancels a drag still in preview; lift the remaining finger before the next gesture.

Units

QuantityUnit
Coordinates, lengths, distances, AGV sizemillimetres (mm)
Speedscentimetres per second (cm/s)
Acceleration and brakingcm/s²
Times, intervals, durationssimulated seconds (s); battery autonomy and charge time in hours
Anglesdegrees, counter-clockwise from +X
Image CAD backgrounds10 mm per pixel

Quick conversions: 80 cm/s = 0.8 m/s = 2.88 km/h; 1 m = 1000 mm.

Scenario defaults and ranges

SettingDefaultRange
Fleets11–8
AGV count30–50 per fleet, 1–50 in total
Minimum distance between AGV centres1000 mm100–10 000 mm
Straight speed (per fleet)80 cm/s1–1000
Curve speed (per fleet)40 cm/s1–1000
Acceleration (per fleet)40 cm/s²1–1000
Deceleration (per fleet)60 cm/s²1–1000
Order interval60 s1–86 400 s
Pickup / drop-off time (per fleet)12 s / 12 s0–3600 s
Order priorityOldest reachable—
AGV selectionNearest to pickup—
BatteryOff—
Battery thresholds30 % → 80 %1–99 % / 2–100 %
Disturbances (each kind)Off—
Disturbance frequencyMediumLow … Extreme
Disturbance stop duration (min–max)5–30 s obstacles, 120–600 s faults, 30–120 s pickups and drops1–86 400 s
Manual zone reservation (each zone)OffLow … Extreme; 60–300 s
Backup for empty pickup / full dropOff—
Battery type (per fleet)LithiumLithium, lead-acid
Unloaded autonomy (per fleet)8 h0.01–168 h
Charge time 0–100 % (per fleet)2 h lithium, 8 h lead-acid0.01–72 h
AGV drawing size, length × width (per fleet)1600 × 900 mm10–50 000 mm
Run duration8 h1, 4, 8, 24 h

Limits

ItemLimit
Traffic zones per layout100
Measurements and text annotations1000
Text annotation2000 characters, 30 lines
Plant logic200 blocks, 400 connections
Plant logic runtime500 sequences, 1000 pending orders
Runs in the comparison12 per session
Results of one archived run100 MB
Saved project or uploaded file100 MB
CAD source (DWG, ASCII DXF)100 MB
Snap distance6 screen pixels
Drawing grid100 mm

What the model does and does not do

  • Respects path directions and links; never invents reverse routes or repairs layouts.
  • Integrates acceleration and braking; stops exactly before reversing.
  • Avoids collisions locally with swept-footprint reservations and a braking corridor; exclusive zones add one-at-a-time access. With the traffic rules off it keeps only station, charger, parking and aisle capacity.
  • Does not guarantee freedom from deadlocks, model steering or grip, or represent the safety of real vehicles.
  • Battery curves are illustrative, not calibrated.
  • Random missions and disturbances use the scenario seed. Matching layout, scenario, seed and engine version reproduce results at the same simulated duration; changing the model can change random draw order. Disturbance durations are the configured ones, not measurements of a real plant.

Glossary

Allocation
Choosing which AGV takes an order (AGV selection rule).
Dispatching
Choosing which queued order is served next (mission priority).
Lead time
Time from the creation of an order to its delivery.
Execution time
Time from assignment to delivery.
P95
The value below which 95 % of observations fall.
Throughput
Missions completed per hour.
Utilisation
Share of time a vehicle is not idle.
Gridlock
Vehicles with missions waiting on each other so that none can move.
Return
An idle vehicle driving to a free charger or parking; not a transport mission.
Sequence
In Plant logic, one independent flow through the blocks started by a trigger.
Cusp
A point where the vehicle changes direction of travel and must stop.